From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUME CLINTON G.
HUFFMAN
1618
Camelot Pl. Miami,
OK 74354 Home:
(918) 542-6253 Cell:
918-541-4908 E-Mail:
cghuffman@yahoo.com
SUMMARY More
than 29 years’ experience in Master Planning, Program Planning, Proposal
Planning and Management. Also have more than three years of experience
with Marketing and Market Research. More than 24 years of diversified
and increasingly responsible experience in corporate and DoD security.
Speak excellent German. Active member of Project Management Institute
(PMI)
SKILLS Expert
in MS Project, knowledgeable of Project Scheduler 8.5 and very
proficient with Primavera P3E and Primavera v6. Proficient with MS
Office suite, Visio 2000 and SharePoint. Expert in Work Breakdown
Structure (WBS) development and implementation, proficient with Earned Value
Management Systems (EVMS) guidelines and implementation, Critical Path
Methodology (CPM) network development, worked on a number of proposals,
Market Research and analysis, 24 years of DoD and corporate security
(Physical, Personnel, Information Security, Counter-Terrorism).
EXPERIENCE 11/14
– Present: PROJECT CONTROLS ANALYST, AMERICAN ELECTRIC POWER (AEP) ·
Conduct schedule maintenance, collect progress data,
develop and implement project schedule/status reports, and provide
consistent, accurate information to the project team. ·
Perform all Primavera project schedule and cost related
updates throughout the life cycle of projects assigned. ·
Interface with Engineering, Construction, Planning,
Project Management and other Transmission partners to verify updated
Primavera schedule, resource and cost information. ·
Conduct and lead project schedule baseline review meetings
with team members. ·
Analyze project progress and make recommendations as to
forecasted costs. ·
Maintain estimated costs in Primavera. ·
Perform final project assessment to ensure compliance with
PCG standards. ·
Assist in developing metrics and measures for the
TE&PS project portfolio. ·
Participate in development of project control standards
and guidelines. ·
Ensure Planning, Engineering, Construction, Project
Management are following PLMP process. 10/13
– 12/13: ASSESSMENT TEAM MEMBER, NTVI FEDERAL · Worked
as a Team Member on the NTVI- Luster Joint Venture and conducted a thorough,
comprehensive assessment of current Omaha District (NWO) use of business
and/or program/project management processes. This included USACE
Project Management Business Processes (PMBP), as well as compliance with
existing local Standard Operating Procedures. Concurrently, the
use of tools and data systems (focus on P2 schedules and PMPs) was also
evaluated. The effort resulted in a final report and implementation
recommendations. 7/12
– 4/13: PROJECT PLANNER, CORPORATE BIZ SOLUTIONS, INC. · Worked on
a contract assignment with Conoco Phillips, Bartlesville, OK as a Project
Planner using Primavera P6, SAP reports, Steelray, Sharepoint, MS Project
2003 & assorted other software to support the Project Services
function that does IT Planning for the Corporation. · Provided
planning expertise throughout the phases of the project life cycle –
Initiating, Planning, Executing, Controlling, Closing · Worked
with multiple project managers to develop a project schedule that adheres to
and maintains the key planning and controlling elements set forth in
ConocoPhillips’ planning processes and methodologies · Created
the project work breakdown structure, preparing cost reports from SAP and
providing cost analysis, setup and maintenance of earned value progress
reporting, variance reporting, status reporting, and resource analysis and
balancing. · Interfaced
with the Project Manager to ensure task data was incorporated into the
integrated project schedule ·
Incorporated approved change orders into the project
schedule and reports ·
Created and ran custom SAP reports on a regular and ad hoc
basis for project management use 12/11
– 4/12: MASTER SCHEDULER, CUTTING EDGE COMMUNICATIONS, LLC · Worked on
a contract assignment with Goodrich ISR in Albuquerque, NM as the Master
Scheduler on a DoD project using MS Project 2007. The assignment consisted of
the usual types of activities, such as: weekly status updates to the IMS,
creating special reports for management and attendance at a number of
recurring meetings.
The
project will be implementing a tailored version of EVMS in 2012 and that
challenge will be a primary focus in addition to providing normal scheduling
support to the project 3/11
– 7/11: MASTER SCHEDULER, NER, PEMBROKE, MA · Performed
as the Master Scheduler on the Tactical Armored Patrol Vehicle (TAPV)
Canadian government proposal for Force Protection in SC using MS Project
2003. Provided the full suite of scheduling services in support of the
client’s proposal response to the Canadian government that has the potential
to result in a high-value, long term influx of revenue. CWBS
development and the program IMS development and Executive Summary and Program
Management Plan were the main areas of concentration. · Developed
the initial CWBS for the proposal and assisted with the development of unique
Basis of Estimate documents due the multinational aspect of the proposal. · Provided
schedule development and support to several other Force Protection projects
that have foreign customers. The suite of Force Protection armored
vehicles are used to protect the lives of their troops in combat areas. · Acted as
the primary Scheduling SME for the customer in the selection and placement of
additional Schedulers. · Provided
input for MS Project training for client personnel. Also provided the
client with EVMS training materials and documentation of the integration of
Cobra and MS Project to support long-term goal of standing up a certified
Earned Value Management System. 9/2008
– 10/1/10: SR. PROJECT CONTROL ENGINEER, PMC SOLUTIONS, INC,
ALBUQUERQUE, NM · Long term
assignment to the Army Corps of Engineers (USACE), Kansas City District
providing P2 support for all District project schedules. Primary
tasking was customer support and project activities related to the P2 system,
training of junior controls personnel, Help Desk and trouble shooting,
implementation of CPM Schedules, Work Packages and Cost Accounts, development
of periodic Status Reports, and training related to P2 for groups or
one-on-one. · Led the
creation and maintenance of integrated schedules for USACE, Kansas
City. The schedules were created using P2, which is the USACE
Enterprise tool that utilizes P3E and Oracle as their backbone for planning,
executing, and reporting project and program information. Some of the
schedules were created with Primavera v 6. 01/2007
– 6/2008: ASSOCIATE, STEVEN MEYERS & ASSOCIATES (SM&A), NEWPORT
BEACH, CA · Worked
with a commercial client in Birmingham, AL to develop Scheduling Processes
and Desk Procedures to support a newly-minted PMO. Assisted with the
development and use of an Enterprise Resource pool with the long term goal of
transitioning to MS Project Server. Training client personnel on use of
MS Project and other items that are integral to good project scheduling
practices. Drafted a notional schema to point charge numbers to the
Control Account and Work Package levels. · Performed
on assignment with a customer in Anaheim, CA leading the effort to help the
client develop, format & implement its first fully EVMS compliant
Integrated Master Schedule for a major DoD project. Also, developed EVM
S compliant schedules for six other smaller projects as well as identified
areas of the client EVMS Process Description that needed additional
clarification, or may have been left out initially. · Performed
as representative of the customer to the DCMA Joint Surveillance team in
Tucson. Secondary responsibility was to conduct Internal Reviews of
major EVMS programs during breaks in the DCMA Joint Surveillances until the
end of 2007. · Assisted
EVMS programs with a multitude of outstanding issues needing correction to
better prepare them for a major DCMA Review in 2008. The major emphasis
is to assess all EVMS compliant IMS’s, recommend Corrective Actions to bring
them into ANSI 748 compliance & follow up with direct assistance to
retool them as needed . · Worked on
a contract in Tucson, AZ as a Senior Scheduler responsible for coordination
and maintenance of the Integrated Master Schedule and the Monthly deliverable
of that schedule to the DoD customer on a high-visibility DoD program. · Responsible
for the creation of Monthly Metrics, such as Wellness Report, Trip Wire
Reporting and assorted IMS related reports as required by management · Processed
& incorporated a large number of Baseline Change Requests into the IMS on
a monthly basis, actively worked a number of issues to help the program
transition to fully Earned Value Management Systems requirements on 1 Oct 07 · Senior
Scheduler responsible for coordination and maintenance of the Integrated
Master Schedule and the Monthly CDRL deliverable of that schedule to the DoD
customer on a Earned Value Management Systems program in New Jersey. · Conducted
weekly update sessions with CAMs , generated a number of special reports to
management regarding schedule viability, potential schedule roadblocks &
insure synchronization with lower tier schedules and MPM for EV reporting. · All
SM&A positions required use of MS Project 2003. 10/2006
– 01/2007: SR. PROGRAM PLANNING & CONTROL ANALYST, L-3
COMMUNICATIONS, INC, TULSA, OK · Responsible
for the creation, coordination and maintenance of the Integrated Master Schedule
in MS Project 2003 and the Monthly CDRL deliverable of that schedule
to the DoD customer on a high-value Earned Value Management Systems program. · Conducted
weekly update sessions with CAMs to proactively manage a dynamic schedule
that was driven by missions that are requested on very short notice. · Generated
a number of special reports to management regarding schedule viability,
potential schedule roadblocks & insure synchronization with lower tier
schedules and MPM for EV reporting. 5/2006
– 9/2006: SR. PROJECT CONTROL ENGINEER, PMC SOLUTIONS, INC,
ALBUQUERQUE, NM · Worked on
temporary assignment to the Army Corps of Engineers (USACE), Kansas City
District providing P2 support to the Environmental Division. Primary
tasking was to do data modification to more than 150 schedules in preparation
for the implementation of Earned Value reporting. · Responsible
for the creation and maintenance of integrated schedules for USACE, Kansas
City, Environmental Division. The schedules were created using P2,
which is the USACE Enterprise tool that utilizes P3E and Oracle as their
backbone for planning, executing, and reporting project and program
information. · Assisted
in the authoring of business processes unique to the Kansas City
District. Processes will supplement USACE Processes as well as detail
local P2 execution of routine business practices. 11/2005
– 5/2006: SR. SCHEDULER, LUSTER NATIONAL, SACRAMENTO, CA · Generated
the first set of Earned Value charts for the Louisiana Coastal Authority
business unit of the United States Army Corps of Engineers (USACE) in New
Orleans, LA. The acceptance of the Earned Value reporting methodology
that incorporates data uniquely used by USACE is anticipated to be the
prototype for USACE at the Enterprise level. · Assisted
in development of several Processes to support the USACE implementation of
Earned Value reporting. Some of the Processes include topics such as
Baselining and Schedule Change Control. · Responsible
for the creation and maintenance of a large number of integrated schedules
for USACE, New Orleans. The schedules are created using P2, which is
the USACE Enterprise tool that utilizes P3E and Oracle as their
backbone for planning, executing, and reporting project and program
information. 9/2005
– 11/2005: SR. SCHEDULER, ENGINEERING SERVICES GROUP (ESG), PARSIPPANY,
NJ · Took a
short-term assignment as a Contractor to Raytheon in Portsmouth, RI. As
a Sr. Scheduler on the DDX contract, provided the full suite of scheduling
support for four key elements of the program using Microsoft Project
Enterprise. · Conducted
weekly EV sessions with CAMs, updated the Element level schedules, generated
tailored performance reports for senior level management use and conducted
training for CAMS. 5/10/2004
– 9/2005: PROJECT CONTROL ANALYST, SCIENTIFIC APPLICATIONS
INTERNATIONAL CORPORATION (SAIC), NEW ORLEANS, LA · Lead
Project Control Analyst for more than thirty Information Technology projects
ranging in value from $5K - $1M and higher. Responsible for determining
the cost and price of the projects, creating and maintaining the resource
loaded schedules using Project Scheduler 8.5 and creating project specific reports
for Entergy management. · Hands-on
contributor to the development and maintenance of Work Breakdown Structures
(WBS’s) and related dictionaries, Basis of Estimates (BOEs), Resource Loaded
Networks (RLNs), Budgets, and Estimates at Completion (EACs), as well as the
implementation of Earned Value methodologies. · Prepared
written and verbal reports and presentations directed to management and
customers, which reference cost and schedule status. 11/1/2003
– 5/10/2004: P2 CONSULTANT, PROJECT SCHEDULING PROFESSIONALS, LLC,
SLIDELL, LA · Worked as
a subcontractor for Luster National to instruct the Army Corps of Engineers
on P2, which consists of automated COTS project and program management,
analysis and reporting tools configured to support their Project Management
Business Process, to be used by the Project Delivery Team and the vertical
teams in planning, executing, and reporting project and program
information. The backbone of P2 is Primavera P3E. Achieved excellent
results at several different Corps of Engineers locations with classes
averaging approximately twenty students. 8/1/2002
– 10/31/2003: PROGRAM MANAGEMENT SPECIALIST, PSI INC, SLIDELL, LA · Led the
effort to identify and select a project management tool for use by the
corporation; the first attempt to do so in the more than thirty years.
Developed all of the evaluation and selection criteria, which resulted in the
selection of MS Project 2002 in Dec 2002. · Coordinated
the MS Project 2002 training sessions for more than 20 PSI personnel in Dec
2002 · Developed
and instructed a day long project management training course for project
managers and key staff at three PSI job sites in Dec 2002 · Acted as a
“Help Desk” for program management questions and issues for all PSI personnel · Developed
a day long briefing on Earned Value Management Systems for presentation to
project managers and key PSI staff · Performed
a study on how the South Group managed projects. From this a suggested
standard methodology evolved to standardize and incorporate all projects
using the selected PM tool. · Developed
the Integrated Schedule for the AAC SPVA contract, plus associated reportage,
including a tailored Earned Value report utilizing labor hours 2001
- 2002: SENIOR PROJECT CONSULTANT, PMMC INC, SLIDELL, LA · Developed
and delivered an Enterprise level WBS for the Entergy Transmission and
Distribution Groups of Entergy Corporation to facilitate timely and accurate
cost data collection and detail all of the deliverables in the five phases of
their Capital Projects Process. · Developed
and delivered the supporting WBS Data Dictionary to complement the Enterprise
level WBS · Provided
ongoing consulting services to the Client’s WBS Implementation Manager · Led the
effort to update the Capital Projects Process top level flow charts, redefine
organizational Roles and Responsibilities documentation and facilitate top
level management review and approval · Assisted
with the development of the initial version of a Desktop Manual for the
client organization that will be used to help orient new personnel and
supplement other organizational policies · Provided
ongoing Project Management consulting services to the client as requested · Did the
majority of the personnel recruitment, selection and hiring for PMCC · Actively
involved in the Marketing and Business Development functions, plus PMCC
Teaming issues 1997
- 2001: SENIOR PLANNER/PLANNING MANAGER, LOCKHEED MARTIN/AFFILIATED
COMPUTER SERVICES, NEW ORLEANS, LA · Heavily
involved in the effort to implement Primavera/Time Control 3 so the DIMHRS
(ACAT 1AM) program can smoothly transition to this software for Cost/Schedule
Integration and real-time labor hour entry by schedule tasking · Led the
effort to create a product-oriented schedule for the DIMHRS program.
The end product received high praise from program management · Performed
the research and contributed significantly to the effort to develop an
Enterprise level Organizational Breakdown Structure (OBS) for resource
allocation at the Enterprise level, and a standard WBS for the programs under
the Information Technology Center in New Orleans · Attended a
four-day conference on Earned Value Management Systems to increase level of
expertise in 1999 · Co-authored
multiple Planning protocols as part of overall program effort to define
standard processes · Provided
staff guidance and internal training to program Planning personnel · Personally
recruited all Planning personnel and staffed all New Orleans contracts with
experienced and highly qualified Planners from 1997 - 1999 · Led the
effort to create a standardized WBS, Data Dictionary and implementation
guidelines for Associate Contractors of NAVRESINFOSYSOFF in New Orleans in
1997 - 1998 · Created
the Master Integrated Program Schedule in MS Project 98, Data
Dictionary, CWBS Index and all other Planning required tools for the DIMHRS
program and keep them updated · Actively
participated in a Statement of Work revision that led to a significant
refocusing of the program’s direction · Assisted
the Business Operations Manager for the New Orleans operation in the initial
effort to scope the level and type of work associated with the MPM-21 program
and helped to create pricing tables and schedules · Became
familiar with the content and preparation of key program documents required,
such as the CARD, LCCE and CAIV 1995
- 1997: TECHNICAL PROGRAM COORDINATION AND CONTROLS, INTEGRATED
BUSINESS SOLUTIONS, LOCKHEED MARTIN · Worked on
EWR Task Order with Lockheed Martin Services Inc. via IDOD from
11/13/96 – 2/1/97 as a Market Research Specialist, as well as writing
portions of deliverable documents · Responsible
for all Planning and status reporting in the Accounts Group · Developed
and maintained all planning products for the Year 2000 team for the
Methodology Development Phase and Initial Study Phases · Developed
integrated, resource loaded schedules for a major Federal program using MS
Project 95, as well as numerous related status reports · Developed
and implemented Migration Planning, tracking and Lessons Learned activity for
tracking current and forecasting future mainframe migrations from new
customers to Orlando and Beltsville Data Centers · Maintained
the Action Item database for the Accounts Group · Coordinated
major internal Reviews and prepared Minutes and Action Items that result from
the Reviews 1991-1994:
MARKETING AND ADVANCED PROGRAMS, COMMERCIAL INFORMATION SYSTEMS, MARTIN
MARIETTA · Daily
involvement with market research and analysis utilizing on-line services and
other available resources · Primary
interface for lead development with other Commercial Information Systems
entities · Acted as
Planning Lead for Master Planning in Washington, DC area in support of Data
Center conversion for major contract win · Developed
and prepared all the Planning products for three major Federal proposals,
used Microsoft Project 4.0 · Spearheaded
the effort to make Microsoft Project the standard project management tool for
Commercial Information Systems · Assisted
with Capital Planning and development and Long Range Operating Plan
development 1989
- 1991: CHIEF, PROGRAM PLANNING, CDOS PROPOSAL, MARTIN MARIETTA · Responsible
for all Planning activities on the Customer Data Operating System (CDOS)
program, used Microsoft Project 4.0 · Single
point of contact and interface for all Business Operations related activities
on the program · Coordinated
Cost Management, Procurement, Contracts, Sub-contracts, Repro/Graphics,
IDODs, Temporary manpower, Personnel and Logistical matters as needed by
management 1988
- 1989: SYSTEMS ENGINEERING PLANNER, COMMERCIAL TITAN, MARTIN MARIETTA · Responsible
for development of special purpose Systems Engineering and Program Schedules
and network maintenance · Established
the IV & V interface between Commercial Titan and the IV & V
contractor and developed all necessary tools · Established
and maintained numerous schedules, action item lists and networks to support
an Acoustics recovery implementation study. Directed the overall work
effort. 1986
- 1988: PAYLOAD INTEGRATION PLANNER, TITAN IV, MARTIN MARIETTA · Responsible
for schedule development, networks, action items and maintenance of
implementation of PMS for classified DoD payloads · Performed
as Launch Support Integration Contractor Planner for the first launch of
Titan IV · Developed
all necessary planning products for four payloads · Researched
new Air Force requirements concerning System Security Engineering, developed
briefing on Titan IV SSE needs and concerns and presented to Air Force
customer · Staffed
and developed methods to isolate and secure payload integration personnel and
ADP equipment. Wrote Security Plan. 1985
- 1986: MARTIN MARIETTA CORPORATION, STAFF ENGINEER · Responsible
for the development and implementation of the AFSCF and STS Operations
Security (OPSEC) Programs · Developed
the first AFSCF OPSEC Plan and local implementing directives · Developed
OPSEC assessment methodology for DoD STS flights supported by the AFSCF · Conducted
OPSEC assessments and presented OPSEC briefings · Developed
methods to protect identified security vulnerabilities (Physical, Personnel
and ADP) 1984
- 1985: REVCO DRUG STORES, INC., AREA SECURITY SUPERVISOR 1982
- 1984: U. S. AIR FORCE, DIRECTOR OF SYSTEM SECURITY ACQUISITION FOR
CSOC/CHIEF, SECURITY PLANS AND PROGRAMS, AFSCF 1962
- 1984, U.S. AIR FORCE (CAPT, RETIRED) EDUCATION · B.S in
Criminology, University of Albuquerque, 1972 · Twelve
units toward Master of Public Administration · Numerous
professional and management courses CLEARANCE · Secret
(currently inactive) |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
German |
Intermediate |
|
|
|